Sleepouts:-Stock plans 12M² floor area.
Full construction documentation.
No building consent required.
$195.00 NZD+GST

BUY NOW_contact us and quote stockplan #

-

& Dave says...

SLEEP OUT 195/11b.
$195.00 NZD+ GST
Building Footprint: - 4.5M x 2.6M=(12M²
)

Small, compact sleep-outs under 12 sqm are the perfect solution for those looking to add an extra room or office space to their home without needing a building consent. These small spaces can be used as a home office, guest bedroom or student sleep-out and offer all the comforts of a larger space in just 12 square metres.
The great thing about these small sleep-outs is that they don’t require any planning permission from local authorities due to their size and so can be built quickly with minimal disruption. They also provide excellent insulation due to their smaller area which helps keep energy costs down when heating them during winter months. Furthermore, because of its diminutive size it requires very little furniture making it easier on your wallet too!
Finally, these tiny homes come with many advantages such as being able to move them if you decide you want your living arrangement somewhere else - something not possible with traditional buildings requiring planning permission! All in all this makes small compact sleep-outs under 12 sqm the perfect addition for anyone wanting an extra room without having worry about dealing with paperwork or bureaucracy associated with bigger projects – giving you peace of mind knowing that everything has been taken care off quickly and easily!

Buildings exempt from local authority Building Consents

Non consentable buildings / buildings exempt from building consents.

August 2020, additional building consent exemptions have been added to the Building Act. Building consents are no longer be needed for a number of new or expanded types of low-risk building work, like sleep-outs. Building work that does not require a building consent must still comply with the Building Code and other legislative requirements, such as those under the Resource Management Act 1991, the Electricity Act 1992 and the Health and Safety at Work Act 2015.
Any issues related to planning or resource management, or any projects with district planning implications will still need to be discussed with your local council.

Before carrying out exempt work, it's important you follow the MBIE guidance correctly.
Small cabins can serve as sleep-outs, extra rooms, storage facilities, hobby room, temporary staff accommodation or simple just a storage space.
The unit example is a simple space but offers a little flexibility in joinery units, roof pitch, outdoor living area?
This design set of drawings is providing you with sufficient detail and construction information to give to your Builder/ Engineer in order to provide an accurate pricing needed or to start construction as per NZBC / NZ Standard requirements

Drawing sheet list to _sleep-out plan (195/11b)
1 A_0 Cover sheet
2 A_01 Rendered images
3 A_02 Project legend
4 A_10 Floor plan & sub floor foundation plan
5 A-12 Roofing plan _bracing plan & calculation sheets
6 A-13 NZS3604 foundation pile details
7 A-20 Elevations-north / south and risk matrix
8 A-21 Elevations-east / west   and risk matrix
9 A-30 Sections
10 A-40 Typical cavity -W/bs_ranchslider to timber deck details
11 A-41 Typical cavity -W/bs_penetration details
12 A-42 Typical cavity -W/bs_isolated baseboard details
13 A-43 Typical cavity -W/bs_window & external cladding details
14 A-44 Typical roofing details
15 A-50 E2/AS1 working roof details
16 A-51 Nailing schedules to sub-floor and roofing as per NZS3604
17 A-52 Lumberlok lintel schedule_and fixing data sheets
18 A-53 Bracing design data sheets
19 A_54 NZS3604 foundation pile details

The client acknowledges...

You acknowledge our recommendation that you have a LBP Builder / Designer or Architect / Engineer to review the drawing set to provide any site-specific design works if deemed necessary.
The Plans provide ideas and concepts and are not intended to be complete in all respects and details. Variations in standard sizes (e.g., of windows and doors), and brands, thickness, types and uses of different materials can all be changed.
Names of materials and manufacturers shown on the plans do not represent an endorsement or recommendation by the designer. Final selections of materials are the responsibility of you and/or your builder, including proper installation of materials to code requirements.
VizMedia Design has no control or responsibility with respect to such matters.

You as the client agree to consult with a local building official / Builder / LBP or Architect to review the drawing set for further information required prior to submission of the Plans for a building permit or to construct as under the August 2020 NZ Building Act exemptions .
Your right to use the Plans is conditioned on your agreement to, and you affirm that you shall:
(i) consult a locally licensed designer or engineer of your choice prior to beginning construction, and
(ii) strictly comply with all local building codes, zoning requirements, and other applicable laws, regulations, ordinances, and requirements
(iii) Geo-Tech report may or may not be required. This would be determined by your Engineer or LBP. Foundation & bracing design would be related to this if required.

Scroll to Top